Home > Case Studies > Assemblies > Salvador
The result
| Annual volume | c. 250,000 vehicles |
| Model flexibility | 2 models |
| Volume flexibility | 100% |
| Planned OEE | 85% |
| Net capacity | 47 JPH |
| Design cycle time | 65 seconds |
| Spot welds per vehicle | 985 (25% of vehicle) |
| Robots | 110 |
| Employees | 360 |
| Floor area | 31,500 m2 |
Below is an example of a flexible robotic production cell producing body structure sub-assemblies:
An example of a flexible robotic production cell producing body closure assemblies:
